Construction Change Order Software

Price the change,protect the margin.

Every change order carries its cost and its schedule impact — approved and signed, never quietly absorbed.

Change Orders · Cedar Heights
6 TOTAL · 2 OPEN · 1 IN REVIEW · 1 OVERDUE
RefTitleOwnerStatus

Margin is lost one absorbed change at a time. ErectOS makes every change a tracked, priced, two-sided transaction — cost and schedule impact attached, owner and sub kept in lockstep — so nothing gets built before it gets paid for.

Priced, both sides

Owner change orders and sub change orders stay linked, so the markup you keep is never lost in the shuffle.

Schedule impact attached

Every CO models its days, so the delay is on the record and in the price — not absorbed for free.

Audit-tight

Every change traces back to the RFI, observation, or condition that caused it — defensible from day one.

Catch the change the moment it happens.

Turn an RFI answer, a field observation, or an unforeseen condition into a change event — then price it and route it for approval without re-keying a thing.

1.0 Originate

Change Orders · log
6 TOTAL · 2 OPEN · 1 IN REVIEW · 1 OVERDUE
RefTitleOwnerStatus
ErectOS Pulse

Pulse drafted CO-014 from RFI-118.

Added scope on L2 — $42k, +3 days modeled.

ReviewEdit
1.1
From RFI or fieldOriginate a CO from the record that caused it.
1.2
Cost + schedulePrice the work and model the delay together.
1.3
Two-sided linkOwner CO and sub CO stay tied to each other.
1.4
Approval routingSent for signature with the impact attached.

Know the margin on every change.

Track every change from event to signed, see your kept markup across the job, and watch the budget and schedule update the instant a CO is approved.

2.0 Control

Change Orders · margin
6 TOTAL · 2 OPEN · 1 IN REVIEW · 1 OVERDUE
RefTitleOwnerStatus
Variance alert

$18k of markup is at risk on pending COs.

Pending6
Approved$214k
Kept margin11.4%
2.1
Status pipelineEvent → pending → approved → executed.
2.2
Markup trackingSee the margin you keep across every change.
2.3
Budget syncApproved COs adjust the budget automatically.
2.4
Schedule syncModeled days post to the plan on approval.

Wired to the whole build

Change Orders reads from and writes to every module it touches — your data is entered once and trusted everywhere.

RFIsRFIs → COs

A cost-bearing answer becomes a priced change order in one click.

BudgetsCOs → Budget

Approved changes adjust the budget — never quietly absorbed.

SchedulesCOs → Schedule

Each CO models its schedule delta and posts it on approval.

CommitmentsCOs ↔ Subs

Owner and subcontractor changes stay linked end to end.

Every change order prices its delay before you sign it.

Change Orders → Schedules

The markup you earned is the markup you keep.

COs ↔ Commitments

Nothing gets built before it gets paid for.

Change Orders → Budgets

What is a change order in construction?

A change order is a formal amendment to the construction contract that changes scope, cost, or schedule after signing. Unpriced or untracked changes are one of the fastest ways margin disappears. ErectOS ties every change order to its originating change event, budget line, and pay application.

The change is the margin.Run it in ErectOS.